Useful Links
Engineering
Petroleum Engineering
Drilling Engineering
1. Introduction to Drilling Engineering
2. Fundamentals of Petroleum Geology
3. Rock Mechanics in Drilling
4. Drilling Rigs and Equipment
5. The Drill String
6. Drill Bits
7. Drilling Fluids
8. Drilling Hydraulics
9. Well Planning and Design
10. Drilling Operations and Procedures
11. Well Control
12. Casing and Cementing
13. Directional and Horizontal Drilling
14. Drilling Problems and Mitigation
15. Well Completion and Handover
16. Health, Safety, and Environment in Drilling
Casing and Cementing
Casing Operations
Casing Preparation
Casing Inspection
Thread Compound Application
Centralizer Installation
Casing Running Procedures
Running Speed Control
Weight Monitoring
Fill-up Operations
Casing Hardware
Float Equipment
Float Collar
Float Shoe
Guide Shoe
Centralizers
Bow Spring Centralizers
Rigid Centralizers
Placement Guidelines
Scratchers
Rotating Scratchers
Reciprocating Scratchers
Stage Tools
Stage Collar
Opening Mechanisms
Cementing Fundamentals
Functions of Cement
Zonal Isolation
Casing Support
Corrosion Protection
Lost Circulation Control
API Classes of Cement
Class A Cement
Class B Cement
Class C Cement
Class G Cement
Class H Cement
Cement Chemistry
Hydration Process
Setting Mechanisms
Strength Development
Cement Additives
Accelerators
Calcium Chloride
Sodium Chloride
Retarders
Lignosulfonates
Organic Acids
Extenders
Bentonite
Pozzolan
Microspheres
Fluid Loss Additives
Cellulose Polymers
Synthetic Polymers
Dispersants
Sulfonated Polymers
Polycarboxylates
Weighting Agents
Hematite
Ilmenite
Gas Migration Control
Latex
Expanding Agents
Cement Slurry Design and Testing
Density Design
Hydrostatic Pressure
Formation Pressure
Thickening Time
Pumping Time Requirements
Temperature Effects
Compressive Strength
Development Rate
Final Strength
Fluid Loss Control
API Fluid Loss Test
Static Fluid Loss
Free Water Content
Separation Prevention
Slurry Stability
Rheology
Plastic Viscosity
Yield Point
Cementing Operations
Primary Cementing
Job Planning
Mixing and Pumping
Displacement Calculations
Stage Cementing
Two-Stage Operations
Multiple Stage Systems
Liner Cementing
Liner Hanger Setting
Cement Placement
Squeeze Cementing
Remedial Cementing
Pressure Squeeze
Hesitation Squeeze
Cement Placement Hydraulics
Displacement Efficiency
Centralization Effects
Flow Regime
Mud Removal
Spacer and Flush Design
Chemical Compatibility
Density Hierarchy
Volume Requirements
Turbulent Flow
Reynolds Number
Critical Velocity
Cement Evaluation
Cement Bond Log
Acoustic Principles
Bond Index
Interpretation Guidelines
Variable Density Log
Waveform Analysis
Cement Quality Assessment
Ultrasonic Imaging Tools
360-Degree Imaging
Cement Thickness
Channel Detection
Temperature Logs
Cement Hydration Heat
Top of Cement
Previous
11. Well Control
Go to top
Next
13. Directional and Horizontal Drilling